[vc_row css=”.vc_custom_1462398690895{padding-top: 50px !important;}”][vc_column][trx_block][trx_title type=”3″ align=”center”]Projects[/trx_title][trx_line style=”double”][/trx_block][/vc_column][/vc_row][vc_row][vc_column][trx_tabs initial=”1″ top=”1.5em” bottom=”1.5em”][trx_tab title=”Recreational” tab_id=”sc_tab_1467315133724-5″][vc_column_text]

Nittany Gymnastics

[/vc_column_text][/trx_tab][trx_tab title=”Commercial” tab_id=”sc_tab_1425369859863-1″][vc_column_text]

Value Distribution – Altoona

[/vc_column_text][/trx_tab][trx_tab title=”Retail” tab_id=”sc_tab_1425369860264-2″][vc_column_text]

Office Supply – Pittsburgh

[/vc_column_text][/trx_tab][trx_tab title=”Car Dealerships” tab_id=”sc_tab_1425369860676-10″][vc_column_text]

Thomas Chevrolet

[/vc_column_text][/trx_tab][/trx_tabs][/vc_column][/vc_row][vc_row css=”.vc_custom_1462220351639{padding-top: 50px !important;}”][vc_column][trx_block][trx_title type=”3″ align=”center”]Testimonials[/trx_title][trx_line style=”double”][/trx_block][/vc_column][/vc_row][vc_row][vc_column][trx_tabs initial=”1″ top=”1.5em” bottom=”1.5em”][trx_tab title=”Quality Machine” tab_id=”sc_tab_1425369859863-1″][vc_column_text]

All Clad Quality Machine

[/vc_column_text][/trx_tab][trx_tab title=”University Park Airport” tab_id=”sc_tab_1425369860264-2″][vc_column_text]

University Park Airport

 

University Park Airport was looking for a way to reduce its energy usage as well as its overall carbon footprint.  The initial stage of the project was conducted at Hanger I – which is a 4-bay, private hanger.  The existing VHO T12 fixtures were not only outdated but were drawing a staggering 430 watts.

The Solution:

Energy Stewards was able to retrofit the existing 2 lamp T12 fixtures to energy efficient 4 lamp T8 fixtures that draw only 112 watts.  This wattage savings not only lowered their energy usage, but also reduced their annual carbon footprint from 110.82 metric tons of CO2 to 28.86 metric tons of CO2.  The ACT 129 rebates available to the Airport paid for 41% of the project.  This project also comes with Energy Stewards standard, maintenance saving 5-year warranty on bulbs and ballasts.

Project Cost:  $5,400
Rebates Received:  $2,200
Net Cost:  $3,200
Pre-Installation Fixture Wattage:  430
Post-Installation Fixture Wattage:  112
Pre-Installation CO2 Emmissions:  110.82 Metric Tons
Post-Installation CO2 Emmissions:  28.86    Metric Tons[/vc_column_text][/trx_tab][/trx_tabs][/vc_column][/vc_row][vc_row][vc_column][vc_column_text]

Banner Photo Courtesy of RAB Lighting